CASE STUDY · ENTERPRISE WORKFORCE ANALYTICS

MyDelta

Every team benchmarked.Every node one click away.

Design Lead for an enterprise workforce analytics platform used across 200K+ employees. Six modules, one system.

Design Lead2021 – 20256 modules200K+ employees
ROLE
Design Lead · UX strategy and design
TIMELINE
2021 – 2025
SCALE
200K+ employees across multiple enterprise clients
TEAM
Designer, PM, engineering

40%

faster decision turnaround for managers

6

modules redesigned and moved off the legacy UI

200K+

employees covered by the platform

IN SHORT

The case in thirty seconds

THE PROBLEM

Managers pieced together productivity from fragmented tools, slow Power BI reports and manual KPI pulls. Decisions came late and were hard to defend.

WHAT I DID

Set one strategy across six modules: benchmark instead of just reporting, summary first, and keep legacy views until people trusted the new ones.

THE RESULT

Faster, better-grounded decisions for managers: 40% faster turnaround, and one consistent product instead of six separate tools.

PRODUCT REEL

MyDelta in eighty seconds

A quick tour of the problem, the six modules and what changed for managers.

MY ROLE

What I owned, beyond the screens

Seniority on this project meant setting direction across modules, aligning people with different priorities, and making sure engineering could build what we designed.

I OWNED

  • UX strategy and information architecture across six modules
  • Design principles every module followed
  • One brief agreed across management, support, sales and marketing
  • Design decisions within Power BI’s technical limits
  • Specs and style guidelines for engineering handoff
  • Moving users off the legacy UI without forcing them

WHO I WORKED WITH

  • Management and BU headsPriorities, trade-offs and sign-off
  • Product and engineeringFeasibility, data model and Power BI constraints
  • Managers, analysts and scrum mastersInterviews, prototype walkthroughs and testing
  • Support and salesRequirements from the field and launch plans

THE PROBLEM

Plenty of data. Very little clarity.

Productivity, time and KPI data sat in separate systems. Reports were slow, visuals were hard to read, and nothing compared a team against anything meaningful. Managers and BU heads made decisions on partial pictures.

“It’s hard to identify workload imbalance across roles. Some are overburdened while others are underutilised.”
SCRUM MASTER
“Power BI dashboards with large datasets load slowly, which delays my decision-making.”
DATA ANALYST
“As a BU head, I lack visibility into how effective our mentoring initiatives are across teams.”
BU HEAD

Late decisions

Slow, heavy dashboards delayed calls that needed to be made that week.

Hidden imbalance

Overloaded and under-used people went unnoticed until it became a problem.

Manual effort

Pulling KPIs and formatting reports for stakeholders ate hours every cycle.

STRATEGY

Five principles I set for every module

Six modules built over four years could easily have felt like six different products. These principles kept every decision consistent, and gave the team a shared way to settle debates.

Benchmark, don’t just report

A number means little on its own. Every view compares against the team average, the previous period or an ideal.

Seen inTeam ProductivityTime Profile

Summary first, detail on demand

Answer the manager’s first question on one screen, then let them drill down to any node in the hierarchy.

Seen inTeam ProductivityMentoring

Migrate trust, not just screens

Keep the legacy view available until people trust the new one. Adoption follows confidence.

Seen inTeam ProductivityScheduled Reports

Set up once, run automatically

Turn repeated manual work into a one-time setup and a schedule.

Seen inIntegrationScheduled Reports

Design for how data travels

Dashboards get screenshotted and emailed, so labels and context must travel with them.

Seen inVendor ManagementScheduled Reports

WHY THIS MATTERS

Principles turned design reviews from opinion into a check: does this screen benchmark, summarise first, and keep users’ trust?

PRODUCT STRUCTURE

One product, organised around four jobs

I grouped the modules by the job a user is doing, not by the team that built them. That shaped navigation, entry points and what each role sees first.

CONNECT DATA

Integration

Used byAdmins, Managers

UNDERSTAND PERFORMANCE

Team Productivity

My KPI & My Productivity

Time Profile

Used byManagers, BU heads, individuals

ACT AND GROW

Mentoring

Vendor Management

Used byManagers, BU heads, vendor owners

SHARE

Scheduled Reports

Used byAnyone reporting upward

KEY DECISIONS

Three calls that shaped the product

Each one had an obvious answer that would have been easier to ship. Full decision boards for every module sit beside this case study.

TEAM PRODUCTIVITY

Kept the legacy Output-Effort Matrix

The obvious move

Replace it with all-new charts.

What we did, and why

Rebuilt it with clear performance zones and kept a Classic UI switch. Managers already trusted that chart, and removing it mid-adoption would have cost us that trust.

TIME PROFILE

Grouped people into 20-60-20 buckets

The obvious move

Rank every user by hours worked.

What we did, and why

Segments gave managers a strategy per group and avoided turning the tool into a surveillance leaderboard.

VENDOR MANAGEMENT

Led with leakage, not every KPI

The obvious move

One dense table of every vendor KPI.

What we did, and why

Leakage was the costliest blind spot, so it comes first. KPIs by vendor follow on drill-down.

LEADING THROUGH DISAGREEMENT

Where I had to bring people with me

Most of the hard work was not in Figma. Each of these started as a reasonable request that would have made the product worse.

TEAM PRODUCTIVITY

They wanted

Every legacy control on the new screen.

I showed

A quick prototype: managers needed three answers first, not twenty filters.

We agreed

Summary first, advanced controls in one Actions panel, Classic UI kept.

SCHEDULED REPORTS

They wanted

A straight like-for-like migration.

I showed

Alignment call with Support: failed deliveries were invisible to the people who depended on them.

We agreed

Same functions, new approach, with a failure insight up front.

VENDOR MANAGEMENT

They wanted

Standard Power BI visuals only.

I showed

A quick prototype: the key story, billed vs leakage per hour, works with standard charts.

We agreed

Standard visuals designed for clarity, with labels that survive screenshots.

THE MODULES

Six modules, one system

Each module solved a specific problem, and each one applied the same principles.

Integration module — redesigned MyDelta screen

Integration

Problem

Effort and status meant different things in every team’s Jira.

What changed

One-time setup with Test Connection, field mapping and a scheduler.

Signal

Validated with internal users; one-time setup improved satisfaction.

Team Productivity module — redesigned MyDelta screen

Team Productivity

Problem

No benchmarks and limited drill-down.

What changed

Team vs peer average and previous range, drill-down to any node, Journey Path.

Signal

Higher visibility and positive usability feedback.

Scheduled Reports module — redesigned MyDelta screen

Scheduled Reports

Problem

Hard to find reports, no search, invisible failures.

What changed

Two usage-based categories, search, favourites and a failure insight.

Signal

Positive feedback from internal stakeholders.

Vendor Management module — redesigned MyDelta screen

Vendor Management

Problem

No visibility into leakage; manual reconciliation.

What changed

Leakage meter and trend, top KPIs by vendor, Power BI drill-downs.

Signal

Validated with vertical heads and vendor managers.

Mentoring module — redesigned MyDelta screen

Mentoring

Problem

Managers inferred team health manually across features.

What changed

One overview with hybrid work breakup and an AI assistant.

Signal

Tested with 10 users: better clarity and task completion.

Time Profile module — redesigned MyDelta screen

Time Profile

Problem

No view of how time was actually spent.

What changed

20-60-20 buckets, core vs non-core split, ideal-hours benchmark.

Signal

Positive feedback from internal stakeholders with improved adoption rate.

OUTCOMES

What changed

40%

faster decision turnaround for managers

10

users in Mentoring prototype tests, with better clarity and task completion

6

modules moved to the new UI, with legacy views kept during the transition

BEYOND THE PRODUCT

How I raised the bar for the team

Senior work outlasts the project. These are the things the team kept using.

Shared patterns

Benchmark cards, drill-down, the Actions panel and the legacy switch reused across modules.

Developer-ready handoff

Final specs and style guidelines so engineering could build without guesswork.

Shaping new business

Supported RFPs in insurance; Vendor Management helped win new business.

REFLECTION

What I’d do differently

Set baselines before launch

Time key tasks on the legacy UI first, so every module can show a before and after in numbers.

Design for the person being measured

Time and productivity tracking can feel like surveillance. I’d give every individual their own view first.

Accessible by default

Some charts relied on red and green alone. I’d add labels or patterns so every manager can read them.

CARRYING FORWARD

If I can’t measure the before, I can’t claim the after.

Next projectPre-Deployment Portal