MyDelta Pre-deployment portal · Case study

Built for speed. Designed for transparency. Just smooth pre‑deployment.

A guided portal that turns MyDelta deployments from manual coordination into one shared, validated checklist for IT, DB, Network, Security and Infra teams.

Readiness ITDBNetworkSecurityInfra
The MyDelta pre-deployment portal on a laptop, showing overall readiness at 22% and the Permission Checker module
Role
Design Lead · UX strategy and design
Timeline
4 weeks
Tools
Excel, Copilot, Figma
Users
IT · DB · Network · Security · Infra

The shift

From detective work to a guided checklist.

The portal removes fragmentation and manual overhead from deployment. Every team sees the same readiness status, knows what they own and gets told what is blocking go-live.

Releases move faster, with fewer errors and no guesswork, and every step leaves an audit trail stakeholders can review.

Walkthrough

Five teams, one checklist.

A one-minute walkthrough: why deployments felt like detective work, and how the portal turns them into one shared, validated checklist.

The problem

Deployments were slow, fragmented and error-prone.

Teams lost time to manual coordination, unclear responsibilities and no view of readiness. The result was wasted effort, more support tickets and low confidence that a go-live would succeed.

20–30%

of deployment time went on manual follow-ups, cross-checks and validations.

Process

Four weeks. Four phases.

A fast, iterative sprint from research to a concept deck the team could build from.

WEEK 1WEEK 2WEEK 3WEEK 4
DiscoverResearch synthesis and opportunity areas
DefineInformation architecture and low-fi wireframes
DesignMid-fi flows, tested and iterated
DeliverUI ideation and concept deck

User research

Interviews and shadowing, inside the deployment day.

I interviewed and shadowed the people running deployments to see their day-to-day setup, then defined user types to understand their needs.

6

users interviewed and shadowed

15+

insights synthesised

5+

pain areas identified

  • Planning & Preparation
    • Role-based checklist
    • Infrastructure readiness
    • Stakeholder coordination
  • User & Permission Setup
    • Create domain users
    • Assign roles
    • Validate permissions
  • Software Installation
    • Install .NET, IIS, SQL Server
    • Run dependency checker
    • Enhance installer UI
  • SMTP & Email Configuration
    • Set up SMTP relay
    • Validate credentials
    • Test email functionality
  • DNS & Network Setup
    • Manage DNS propagation
    • Configure VPN/firewall
    • Conduct connectivity diagnostics

Predeployment workflow

  • Database Configuration*
    • Set up ports
    • Allocate storage
    • Run DB health checks
  • Application Server Setup
    • Validate SSL certificates
    • Resolve port conflicts
    • Complete app installation checklist
  • Security Setup
    • Configure proxy/firewall/AV exceptions
    • Ensure binaries are signed
    • Create AV exception templates
  • Hardware Provisioning
    • Allocate CPU/RAM/disk
    • Monitor resource usage
    • Set up capacity alerts
  • Go-Live Readiness
    • Conduct final sanity checks
    • Set up monitoring dashboard
    • Test connectivity utilities
Activities mapping: ten workstreams and the tasks inside each, from planning to go-live readiness.

Challenges → Goals

Every pain point became a design goal.

ChallengeGoal

Siloed visibility

Teams had no single source of truth for deployment progress, which led to misalignment and uncertainty.

Unify visibility across all teams with a transparent, role-based deployment portal.

Manual overhead

Follow-ups, cross-checks and validations consumed up to 30% of deployment time.

Reduce manual effort with automated environment and permission checks.

Reactive firefighting

Support tickets surged after deployment because of overlooked configurations and missed readiness steps.

Ensure accountability with exportable audit reports and diagnostic tools that prevent common setup errors.

Low go-live confidence

Missing pre-checks and manual validations increased last-minute issues.

Build confidence in go-live readiness with real-time validation and progress tracking.

Communication gaps

Poor information flow caused redundant effort and missed dependencies.

Align IT, DB, Network, Security and Infra teams in one interface.

Insights

What we heard, ranked by pain.

Most cited

Lack of shared visibility was the most cited frustration.

Time sink

Manual follow-ups consumed 20–30% of deployment time.

Rework

Miscommunication between teams led to redundant work.

Confidence

Confidence in go-live was low because validation steps were missing.

Support load

Support tickets spiked after deployment because of overlooked configurations.

So the portal had to

Show one shared truth, automate the checks and catch problems before go-live.

Personas

Two people, one deployment.

Meera Iyer

Infra Manager

Compliance Guardian
“Every deployment feels like detective work.”
Key goal

Compliant, verified, zero-error releases.

Pain point

Missing validation checks and siloed communication.

Kishor Kumar

Internal Support Engineer

The Releaser
“If I had one dashboard that showed readiness, I’d save half my day.”
Key goal

Streamlined deployment, visibility and automation.

Pain point

Manual coordination and unclear readiness.

The solution

A pre-deployment portal that does the checking for you.

Guided steps

Walks every user through each deployment stage, with a persistent progress bar.

Automated checks

Verifies environments and permissions without manual cross-checks.

Live readiness

Real-time feedback and readiness status for every team.

Role-based views

Tailored views for IT, DB, Network, Security and Infra.

Diagnostic tools

SMTP tester, SSL validator and DNS checker built in.

Audit-ready reports

Exportable reports for audits and stakeholder reviews.

Key sketch

Two columns, one progress bar.

  • A persistent progress bar keeps overall readiness in view on every screen.
  • The left column lists the stages; the right shows the work and its context.
  • Users move through deployment stages with quick access to the metadata they need.
Hand-drawn wireframe: header with progress bar, a narrow left navigation column and a wide content area with a detail panel

UI language

One status system, read at a glance.

Every check, team and step uses the same four states. It's the backbone of the high-fidelity screens.

Pass

Check verified. Nothing to do.

Warning

Works, but needs a look before go-live.

Fail

Blocks deployment. Owner is notified.

Pending

Waiting on a team or a dependency.

Direction

The flow, screen by screen.

The concept follows the key sketch: a two-column layout anchored by a persistent progress bar, so users always know where they are and what's next.

01

Sign in

A clean sign-in with secure options and system readiness shown upfront.

Sign-in screen with Microsoft SSO and credentials, beside a large 26% readiness figure
02

Validation module

Checks system readiness and shows pass, warning or fail for every prerequisite before deployment.

Environment Validator: operating system and .NET pass, IIS warning, Access Database Engine failed
03

Audit trail and activity log

A clear timeline of validations, highlighting errors, flagged issues and escalations for quick troubleshooting.

Audit trail with counts for errors, flagged and escalated items and an activity timeline
04

Resource hub

Ready-to-use templates, scripts and reports to speed up configuration.

Downloads centre with configuration templates, scripts and reports

High-fidelity

One checklist per deployment.

MyDelta installs on the customer's Windows Server, so the refined screens drop the module-by-module wizard. Each deployment gets a single checklist, grouped by team and written in the four-state language above.

01

One place to look

Every check for a deployment sits on one list, so nobody hunts across modules.

02

Every check has an owner

Teams carry a named owner, and an unowned team is called out in the list.

03

Sign-off is earned

Go-live unlocks only when nothing fails, warnings are accepted and all five teams approve.

Screen 01 · Kishor

Readiness

  • The header answers the first question: 19 of 31 checks passed, 2 blocking go-live, 4 days left.
  • A segmented bar shows passed, warnings, failed and pending in one line, with the last scan time and a button to run the automatic checks again.
  • Checks are grouped by team with their owner. Teams with a failed check open by default; the rest stay collapsed with a one-line summary.
Readiness checklist for Northfield Bank production: 19 of 31 checks passed, checks grouped by Infra, Network, Security, DB and IT
Screen 02 · Meera

Check detail

  • “My team” narrows the list to the five Infra checks Meera owns.
  • The detail panel puts required next to found, says why it failed and gives the fix: a script to copy and run on the app server.
  • Run the check again or reassign it in place. The history shows who ran, assigned and commented, and when.
Check detail for Access Database Engine 2016: required 2016 runtime 64-bit, found not installed, with a fix script, owner and history
Screen 03 · Kishor

Sign-off

  • Warnings don't block, but each one needs a named person and a reason before go-live.
  • Team approvals show who approved and when, and what a team is still waiting on.
  • The sign-off button stays disabled until every condition is met. The audit report exports every check, result, owner and change as one PDF.
Sign-off screen: 28 of 31 checks passed, warnings to accept, team approvals and a sign-off summary

What I’m designing next

  • Diagnostic tools

    SMTP tester, SSL validator and DNS checker in one panel.

    Persona: Meera
  • Team handoff

    Assign owners, track dependencies and notify the next team.

    Persona: Kishor
  • Audit report export

    Exportable, shareable report for audits and stakeholders.

    Both

What success looks like

Targets to measure after launch.

↓

Less manual follow-up

Bring the 20–30% of time spent on follow-ups down, measured per release.

↓

Fewer post-deployment tickets

Track support tickets in the first two weeks after go-live.

1

One source of truth

All five teams working from the same readiness view.

Next projectRFPs